AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Compton fire badge9/2/2023 ![]() ![]() The plant was expanded and upgraded in 19 with advanced nutrient removal technologies. The Compton facility was placed in service in 1988. It provides sewage treatment for residents and businesses in the City and in a large area of Taney County north and west of Branson city limits. The City of Branson’s plant is in the northeast area of Branson next to Lake Taneycomo. “Our team of leaders with the City of Branson also deserve great thanks for moving this much-needed project forward,” Milton said.Ībout Compton Drive Wastewater Treatment Facility, Branson: “We are grateful to our partners for their dedication to a project so very important to our citizens and our community,” said Branson Mayor Larry Milton. The material will be a weathered-steel look for long-lasting finish. The material will be driven into bedrock, interlocking to prevent waters above and below ground from penetrating the compound. This project consists of installing nearly half a mile of sheet pile-type material to create a 7’– 9’ barrier wall, an entry gate and several rain “dewatering” wells to prevent soil saturation. Construction slated for June of 2023 and.Planning stages such as preliminary designs, soil testing, hydrologic modeling 2021/2022.The design plan is complete and the project is currently in the bid phase through early May. (In past high-water events, an AquaDam system/barrier was utilized.) If there is a need to shut down the plant for an extended period, it could adversely impact Lake Taneycomo. With the treatment facility managing an average of three million gallons of wastewater per day, the protection of operations from flood waters is a top priority. It is in response to area flooding of 2017 and several other flood events that occurred years earlier. This mitigation project is considered critical to upgrading the facility, located downstream of Table Rock Dam. SMCOG, located in Springfield, assisted the City of Branson through the grant application process, environmental review, procurement of engineering services, contract management and required reporting. Economic Development Administration (EDA). Department of Housing and Urban Development (HUD) and $3 million was awarded by the U.S. Of the total $13 million in grants, $10 million was awarded through Missouri Department of Economic Development (DED) through U.S. The DED, with support from SMCOG, works directly with the federal government to procure available funding. The project is possible due to the support of Southwest Missouri Council of Governments (SMCOG), the Missouri Department of Economic Development (DED) and federal agencies. With this project, the City of Branson, the State of Missouri, and the federal government are exemplifying strong partnership and commitment to protecting vital infrastructure, the environment and the well-being of the community’s residents and businesses while supporting the economic engine of Branson tourism, which is recognized on a national level. The wall will surround the perimeter of the plant, which processes approximately 80 percent of Branson’s sewage. (BRANSON, MO, ) Missouri Governor Michael Parson traveled to Branson today to celebrate $13 million in grant awards designated to upgrade the City’s Compton Drive Wastewater Treatment Facility. These grant dollars are dedicated to constructing a 7’-9’ wall that will create a flood barrier between the facility and the adjacent Lake Taneycomo. Regularly updating and maintaining the City’s Emergency Operations Plan and Hazard Mitigation PlanĬompton OEM also works closely with numerous municipalities, county, state, and federal agencies, the private sector, and non-governmental, community, and faith based organizations to ensure that residents, businesses, City employees, and community stakeholders are prepared as possible in the event of a natural or man-made disaster.Event photos can be found on the City's Facebook page:.Providing ongoing training for City staff.The City’s emergency notification system.The Community Emergency Response Team (CERT) volunteer program.Management and oversight of the City’s Emergency Operations Center.Developing and implementing community outreach activities and educational programs. ![]() The City of Compton Office of Emergency Management is responsible for coordinating emergency mitigation, planning, response, and recovery efforts for all disasters or other major emergencies affecting the City of Compton. About Compton Office of Emergency Management To ensure the City of Compton is a disaster resilient community through the promotion and provision of emergency preparedness information, awareness, education, and training to all residents, businesses, employees, and community stakeholders. Mission of the Office of Emergency Management ![]()
0 Comments
Read More
Leave a Reply. |